Author: Moya, I.
Paper Title Page
TU2AA04 Commissioning of IFMIF Prototype Accelerator Towards CW Operation 319
 
  • K. Masuda, T. Akagi, A. De Franco, T. Ebisawa, K. Hasegawa, K. Hirosawa, J. Hyun, T. Itagaki, A. Kasugai, K. Kondo, K. Kumagai, S. Kwon, A. Mizuno, Y. Shimosaki, M. Sugimoto
    QST Rokkasho, Aomori, Japan
  • T. Akagi, Y. Carin, F. Cismondi, A. De Franco, D. Gex, K. Hirosawa, K. Kumagai, S. Kwon, K. Masuda, I. Moya, F. Scantamburlo, M. Sugimoto
    IFMIF/EVEDA PT, Aomori, Japan
  • L. Antoniazzi, L. Bellan, M. Comunian, A. Facco, E. Fagotti, F. Grespan, A. Palmieri, A. Pisent
    INFN/LNL, Legnaro (PD), Italy
  • F. Arranz, B. Brañas, J. Castellanos, D. Gavela, D. Jimenez-Rey, Á. Marchena, J. Mollá, P. Méndez, O. Nomen, C. Oliver, I. Podadera, D. Regidor, A. Ros, V. Villamayor, M. Weber, C. de la Morena
    CIEMAT, Madrid, Spain
  • N. Bazin, B. Bolzon, N. Chauvin, S. Chel, J. Marroncle
    CEA-IRFU, Gif-sur-Yvette, France
  • P. Cara, Y. Carin, F. Cismondi, G. Duglue, H. Dzitko, D. Gex, A. Jokinen, I. Moya, G. Phillips, F. Scantamburlo
    F4E, F4E, Germany
  • A. Mizuno
    JASRI/SPring-8, Hyogo-ken, Japan
  • Y. Shimosaki
    KEK, Ibaraki, Japan
 
  Con­struc­tion and val­i­da­tion of the Lin­ear IFMIF Pro­to­type Ac­cel­er­a­tor (LIPAc) have been con­ducted under the frame­work of the IFMIF/EVEDA pro­ject. The LIPAc con­sists, in its final con­fig­u­ra­tion, of a 100 keV in­jec­tor and the world longest 5 MeV RFQ ac­cel­er­a­tor, fol­lowed by a MEBT with high space charged and beam loaded re-buncher cav­i­ties, an HWR-SRF linac, HEBT with a Di­ag­nos­tic Plate, end­ing in a Beam Dump (BD) de­signed to stop the world high­est deuteron cur­rent of 125 mA CW at 9 MeV. The beam com­mis­sion­ing at a low duty cycle of ~0.1 % led to a suc­cess­ful RFQ ac­cel­er­a­tion of 125 mA and 5 MeV beam in 2019. The fol­low­ing beam com­mis­sion­ing phase was ini­ti­ated in July 2021 with a tem­po­rary trans­port line re­plac­ing the SRF linac. The major goals of this phase are to val­i­date the RFQ, MEBT and BD per­for­mances up to CW and to char­ac­ter­ize the beam prop­er­ties in prepa­ra­tion to the final con­fig­u­ra­tion with the SRF linac. This paper will pre­sent pro­gresses made in this phase so far, such as a low-cur­rent and low-duty beam com­mis­sion­ing com­pleted in Dec. 2021, CW op­er­a­tion cam­paign of the in­jec­tor to­wards the nom­i­nal beam cur­rent, and RF con­di­tion­ing of the RFQ to­wards CW.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides TU2AA04 [6.731 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TU2AA04  
About • Received ※ 27 August 2022 — Revised ※ 31 August 2022 — Accepted ※ 02 September 2022 — Issue date ※ 08 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)