JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.
TY - CONF AU - Masuda, K. AU - Akagi, T. AU - Antoniazzi, L. AU - Arranz, F. AU - Bazin, N. AU - Bellan, L. AU - Bolzon, B. AU - Brañas, B. AU - Cara, P. AU - Carin, Y. AU - Castellanos, J. AU - Chauvin, N. AU - Chel, S. AU - Cismondi, F. AU - Comunian, M. AU - De Franco, A. AU - Duglue, G. AU - Dzitko, H. AU - Ebisawa, T. AU - Facco, A. AU - Fagotti, E. AU - Gavela, D. AU - Gex, D. AU - Grespan, F. AU - Hasegawa, K. AU - Hirosawa, K. AU - Hyun, J. AU - Itagaki, T. AU - Jimenez-Rey, D. AU - Jokinen, A. AU - Kasugai, A. AU - Kondo, K. AU - Kumagai, K. AU - Kwon, S. AU - Marchena, Á. AU - Marroncle, J. AU - Mizuno, A. AU - Mollá, J. AU - Moya, I. AU - Méndez, P. AU - Nomen, O. AU - Oliver, C. AU - Palmieri, A. AU - Phillips, G. AU - Pisent, A. AU - Podadera, I. AU - Regidor, D. AU - Ros, A. AU - Scantamburlo, F. AU - Shimosaki, Y. AU - Sugimoto, M. AU - Villamayor, V. AU - Weber, M. AU - de la Morena, C. ED - McIntosh, Peter ED - Burt, Graeme ED - Apsimon, Robert ED - Schaa, Volker R.W. TI - Commissioning of IFMIF Prototype Accelerator Towards CW Operation J2 - Proc. of LINAC2022, Liverpool, UK, 28 August-02 September 2022 CY - Liverpool, UK T2 - International Linear Accelerator Conference T3 - 31 LA - english AB - Construction and validation of the Linear IFMIF Prototype Accelerator (LIPAc) have been conducted under the framework of the IFMIF/EVEDA project. The LIPAc consists, in its final configuration, of a 100 keV injector and the world longest 5 MeV RFQ accelerator, followed by a MEBT with high space charged and beam loaded re-buncher cavities, an HWR-SRF linac, HEBT with a Diagnostic Plate, ending in a Beam Dump (BD) designed to stop the world highest deuteron current of 125 mA CW at 9 MeV. The beam commissioning at a low duty cycle of ~0.1 % led to a successful RFQ acceleration of 125 mA and 5 MeV beam in 2019. The following beam commissioning phase was initiated in July 2021 with a temporary transport line replacing the SRF linac. The major goals of this phase are to validate the RFQ, MEBT and BD performances up to CW and to characterize the beam properties in preparation to the final configuration with the SRF linac. This paper will present progresses made in this phase so far, such as a low-current and low-duty beam commissioning completed in Dec. 2021, CW operation campaign of the injector towards the nominal beam current, and RF conditioning of the RFQ towards CW. PB - JACoW Publishing CP - Geneva, Switzerland SP - 319 EP - 323 KW - rfq KW - MMI KW - simulation KW - operation KW - linac DA - 2022/09 PY - 2022 SN - 2226-0366 SN - 978-3-95450-215-8 DO - doi:10.18429/JACoW-LINAC2022-TU2AA04 UR - https://jacow.org/linac2022/papers/tu2aa04.pdf ER -