Paper |
Title |
Page |
MO1PA02 |
Beam Commissioning of Normal Conducting Part and Status of ESS Project |
18 |
|
- R. Miyamoto, C. Amstutz, S. Armanet, R.A. Baron, E.C. Bergman, A.K. Bhattacharyya, B.E. Bolling, W. Borg, S. Calic, M. Carroll, J. Cereijo García, J. Christensson, J.D. Christie, H. Danared, C.S. Derrez, E.M. Donegani, S. Ekström, M. Eriksson, M. Eshraqi, J.F. Esteban Müller, K. Falkland, A. Forsat, S. Gabourin, A. Garcia Sosa, A.A. Gorzawski, V. Grishin, P.O. Gustavsson, S. Haghtalab, V.A. Harahap, H. Hassanzadegan, W. Hees, J.J. Jamróz, A. Jansson, M. Jensen, B. Jones, M. Juni Ferreira, M. Kalafatic, I. Kittelmann, H. Kocevar, S. Kövecses de Carvalho, E. Laface, B. Lagoguez, Y. Levinsen, M. Lindroos, A. Lundmark, M. Mansouri, C. Marrelli, C.A. Martins, J.P.S. Martins, S. Micic, N. Milas, M. Mohammednezhad, R. Montaño, M. Muñoz, G. Mörk, D.J.P. Nicosia, B. Nilsson, D. Noll, A. Nordt, T. Olsson, L. Page, D. Paulic, S. Pavinato, A. Petrushenko, D.C. Plostinar, J. Riegert, A. Rizzo, K.E. Rosengren, K. Rosquist, M. Serluca, T.J. Shea, A. Simelio, S. Slettebak, H. Spoelstra, A.M. Svensson, L. Svensson, R. Tarkeshian, L. Tchelidze, C.A. Thomas, E. Trachanas, K. Vestin, R.H. Zeng, P.L. van Velze, N. Öst
ESS, Lund, Sweden
- C. Baltador, L. Bellan, M. Comunian, F. Grespan, A. Pisent
INFN/LNL, Legnaro (PD), Italy
- I. Bustinduy, A. Conde, D. Fernández-Cañoto, N. Garmendia, P.J. González, G. Harper, A. Kaftoosian, J. Martin, I. Mazkiaran, J.L. Muñoz, A.R. Páramo, S. Varnasseri, A.Z. Zugazaga
ESS Bilbao, Derio, Spain
- A.C. Chauveau, P. Hamel, O. Piquet
CEA-IRFU, Gif-sur-Yvette, France
|
|
|
The European Spallation Source, currently under construction in Lund Sweden, will be a spallation neutron source driven by a superconducting proton linac with a design power of 5 MW. The linac features a high peak current of 62.5 mA and long pulse length of 2.86 ms with a repetition rate of 14 Hz. The normal conducting part of the linac has been undergoing beam commissioning in multiple steps, and the main focus of the beam commissioning has been on bringing systems into operation, including auxiliary ones. In 2022, beam was transported to the end of the first tank of the five-tank drift tube linac. This paper provides a summary of the beam commissioning activities at ESS and the current status of the linac.
|
|
|
|
|
|
please see instructions how to view/control embeded videos |
|
|
Slides MO1PA02 [18.907 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-MO1PA02
|
|
About • |
Received ※ 20 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 21 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOJO10 |
Hardware Commissioning With Beam at the European Spallation Source: Ion Source to DTL1 |
360 |
TUOPA01 |
|
|
- B. Jones, R.A. Baron, C.S. Derrez, F. Grespan, V. Grishin, Y. Levinsen, N. Milas, R. Miyamoto, D.J.P. Nicosia, D. Noll, D.C. Plostinar, A.G. Sosa, E. Trachanas, R. Zeng
ESS, Lund, Sweden
- C. Baltador, L. Bellan, M. Comunian, F. Grespan, A. Palmieri
INFN/LNL, Legnaro (PD), Italy
- I. Bustinduy, N. Garmendia
ESS Bilbao, Zamudio, Spain
- L. Neri
INFN/LNS, Catania, Italy
|
|
|
The European Spallation Source (ESS) aims to build and commission a 2 MW proton linac ready for neutron production in 2025. The normal conducting section of the ESS linac is designed to accelerate a 62.5 mA proton beam to 90 MeV at 14 Hz. The section consists of a microwave ion source, Radio Frequency Quadrupole (RFQ) and 5-tank Drift Tube Linac (DTL). All sections are provided to ESS by in-kind partners across Europe. This paper reports the recent progress on the assembly, installation, testing and commissioning of the ESS normal conducting linac.
|
|
|
Slides TUPOJO10 [2.397 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO10
|
|
About • |
Received ※ 12 August 2022 — Revised ※ 15 August 2022 — Accepted ※ 28 August 2022 — Issue date ※ 03 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOJO13 |
Wire Scanner Systems at the European Spallation Source (ESS): Tests and First Beam Commissioning Results |
372 |
|
- C.S. Derrez, I. Bustinduy, E.M. Donegani, V. Grishin, H. Kocevar, J.P.S. Martins, N. Milas, R. Miyamoto, T.J. Shea, R. Tarkeshian, C.A. Thomas, P.L. van Velze
ESS, Lund, Sweden
- S. Cleva, R. De Monte, M. Ferianis, S. Grulja
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
- I. Mazkiaran, A.R. Páramo
ESS Bilbao, Derio, Spain
|
|
|
The ESS beam instrumentation includes 3 different type of Wire Scanners (WS). Double wires systems are deployed in the MEBT part of NCL, and single wires and flying wire instruments are being tested and installed in the higher energy sections of the ESS linac. First beam tests result from the MEBT systems will be presented. The superconducting linac WS systems are based on scintillator detectors and wavelength shifting fibers are mounted on the beam pipe. The detectors are coupled to long haul optical fibers, which carry the signals to custom front end electronics sitting in controls racks at the surface. The acquisition chain have been characterized at IHEP (Protvino, Russia), ELETTRA (Trieste, Italy), CERN PSB, CoSy (IKP, Germany) and SNS (USA) before installation in the ESS tunnel. The test results of this system design, differing from the standard approach where photomultipliers are coupled to the scintillator will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO13
|
|
About • |
Received ※ 24 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 30 August 2022 — Issue date ※ 01 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOJO14 |
Status of Testing and Commissioning of the Medium Energy Beam Transport Line of the ESS Normal Conducting Linac |
376 |
|
- A.G. Sosa, R.A. Baron, H. Danared, C.S. Derrez, E.M. Donegani, M. Eshraqi, V. Grishin, A. Jansson, M. Jensen, B. Jones, E. Laface, B. Lagoguez, Y. Levinsen, J.P.S. Martins, N. Milas, R. Miyamoto, D.J.P. Nicosia, D. Noll, D.C. Plostinar, T.J. Shea, R. Tarkeshian, C.A. Thomas, E. Trachanas, P.L. van Velze
ESS, Lund, Sweden
- I. Bustinduy, A. Conde, D. Fernández-Cañoto, N. Garmendia, P.J. González, G. Harper, A. Kaftoosian, J. Martin, I. Mazkiaran, J.L. Muñoz, A.R. Páramo, S. Varnasseri, A.Z. Zugazaga
ESS Bilbao, Derio, Spain
|
|
|
The latest beam commissioning phase of the Normal Conducting Linac at ESS delivered a proton beam through the Medium Energy Beam Transport (MEBT) into the first Drift Tube Linac (DTL) tank. The probe beam in MEBT consisted of 3.6 MeV protons of <6 mA, <5 microseconds pulse length and 1 Hz repetition rate. Following the delivery of the components at ESS in Lund in June 2019, the commissioning phase with the MEBT was completed in July 2022. In March 2022, the maximum beam current of 62.5 mA was transported up to the MEBT Faraday cup. This proceeding focuses on the status of MEBT including magnets, buncher cavities, scrapers and beam diagnostics designed and tested in collaboration with ESS Bilbao.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO14
|
|
About • |
Received ※ 13 August 2022 — Revised ※ 19 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 01 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOPA04 |
First Beam Matching and Transmission Studies on the ESS RFQ |
414 |
|
- D. Noll, R.A. Baron, C.S. Derrez, E.M. Donegani, M. Eshraqi, F. Grespan, H. Hassanzadegan, B. Jones, Y. Levinsen, N. Milas, R. Miyamoto, D.C. Plostinar, A.G. Sosa, R. Zeng
ESS, Lund, Sweden
- A.C. Chauveau, O. Piquet
CEA-IRFU, Gif-sur-Yvette, France
|
|
|
The European Spallation Source will be driven by a 5 MW linear accelerator, producing 2.86 ms long proton beam pulses with a peak current of 62.5 mA at 14 Hz. Following the source commissioning in 2018 and 2019, the RFQ was successfully conditioned and subsequently commissioned with beam in 2021. In this paper, we will present results of studies on beam matching to the RFQ, both for low and high current beam modes, and will compare these results to model predictions.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOPA04
|
|
About • |
Received ※ 26 August 2022 — Accepted ※ 05 September 2022 — Issue date ※ 05 September 2022 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|