MO1PA01 Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility 13
 
  • E. Pozdeyev, R. Andrews, C.M. Baffes, M. Ball, C. Boffo, R. Campos, J.-P. Carneiro, B.E. Chase, A.Z. Chen, D.J. Crawford, J. Czajkowski, N. Eddy, M. El Baz, M.G. Geelhoed, V.M. Grzelak, P.M. Hanlet, B.M. Hanna, B.J. Hansen, E.R. Harms, B.F. Harrison, M.A. Ibrahim, K.R. Kendziora, M.J. Kucera, D.D. Lambert, J.R. Leibfritz, P. Lyalyutskyy, J.N. Makara, H. Maniar, L. Merminga, R. Neswold, D.J. Nicklaus, J.P. Ozelis, D. Passarelli, N. Patel, D.W. Peterson, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, J. Steimel, A.I. Sukhanov, P. Varghese, R. Wang, A. Warner, G. Wu, R.M. Zifko
    Fermilab, Batavia, Illinois, USA
  • V.K. Mishra, M.M. Pande, K. Singh, Vikas. Teotia
    BARC, Mumbai, India
 
  The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides MO1PA01 [2.714 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MO1PA01  
About • Received ※ 16 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 28 August 2022 — Issue date ※ 13 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPORI24 Beam Dynamics Studies at the PIP-II Injector Test Facility 601
 
  • J.-P. Carneiro, B.M. Hanna, E. Pozdeyev, L.R. Prost, A. Saini, A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
 
  A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to an absorber. This paper presents beam dynamics - related measurements performed at PIP2IT as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPORI24  
About • Received ※ 21 August 2022 — Revised ※ 25 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPORI25 Finding Beam Loss Locations at PIP2IT Accelerator With Oscillating Dipole Correctors 605
TUOPA07   use link to see paper's listing under its alternate paper code  
 
  • A.V. Shemyakin
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
The PIP2IT accelerator was assembled in multiple stages in 2014 - 2021 to test concepts and components of the future PIP-II linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H beam to 16 MeV. To determine location of the beam loss in the accelerator’s low-energy part, where radiation monitors are ineffective, a method using oscillating trajectories was implemented. If the beam is scraped at an aperture limitation, moving its centroid with two dipole correctors located upstream and oscillating in sync, produces a line at the corresponding frequency in spectra of BPM sum signals downstream of the loss point. Comparison of these responses along the beam line allows to find the loss location. The paper describes the method and results of its implementation at PIP2IT.
 
slides icon Slides TUPORI25 [0.447 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPORI25  
About • Received ※ 24 August 2022 — Revised ※ 31 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)