Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility |
13 |
|
- E. Pozdeyev, R. Andrews, C.M. Baffes, M. Ball, C. Boffo, R. Campos, J.-P. Carneiro, B.E. Chase, A.Z. Chen, D.J. Crawford, J. Czajkowski, N. Eddy, M. El Baz, M.G. Geelhoed, V.M. Grzelak, P.M. Hanlet, B.M. Hanna, B.J. Hansen, E.R. Harms, B.F. Harrison, M.A. Ibrahim, K.R. Kendziora, M.J. Kucera, D.D. Lambert, J.R. Leibfritz, P. Lyalyutskyy, J.N. Makara, H. Maniar, L. Merminga, R. Neswold, D.J. Nicklaus, J.P. Ozelis, D. Passarelli, N. Patel, D.W. Peterson, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, J. Steimel, A.I. Sukhanov, P. Varghese, R. Wang, A. Warner, G. Wu, R.M. Zifko
Fermilab, Batavia, Illinois, USA
- V.K. Mishra, M.M. Pande, K. Singh, Vikas. Teotia
BARC, Mumbai, India
|
|
|
The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H− beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.
|
|
|
|
|
|
please see instructions how to view/control embeded videos |
|
|
Slides MO1PA01 [2.714 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-MO1PA01
|
|
About • |
Received ※ 16 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 28 August 2022 — Issue date ※ 13 October 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPORI24 |
Beam Dynamics Studies at the PIP-II Injector Test Facility |
601 |
|
- J.-P. Carneiro, B.M. Hanna, E. Pozdeyev, L.R. Prost, A. Saini, A.V. Shemyakin
Fermilab, Batavia, Illinois, USA
|
|
|
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H− ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to an absorber. This paper presents beam dynamics - related measurements performed at PIP2IT as the Twiss parameters with Allison scanners, beam envelopes along the injector, and transverse and longitudinal rms emittance reconstruction. These measurements are compared with predictions from the beam dynamics code Tracewin.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPORI24
|
|
About • |
Received ※ 21 August 2022 — Revised ※ 25 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 15 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|