JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.
TY - CONF AU - Pozdeyev, E. AU - Andrews, R. AU - Baffes, C.M. AU - Ball, M. AU - Boffo, C. AU - Campos, R. AU - Carneiro, J.-P. AU - Chase, B.E. AU - Chen, A.Z. AU - Crawford, D.J. AU - Czajkowski, J. AU - Eddy, N. AU - El Baz, M. AU - Geelhoed, M.G. AU - Grzelak, V.M. AU - Hanlet, P.M. AU - Hanna, B.M. AU - Hansen, B.J. AU - Harms, E.R. AU - Harrison, B.F. AU - Ibrahim, M.A. AU - Kendziora, K.R. AU - Kucera, M.J. AU - Lambert, D.D. AU - Leibfritz, J.R. AU - Lyalyutskyy, P. AU - Makara, J.N. AU - Maniar, H. AU - Merminga, L. AU - Mishra, V.K. AU - Neswold, R. AU - Nicklaus, D.J. AU - Ozelis, J.P. AU - Pande, M.M. AU - Passarelli, D. AU - Patel, N. AU - Peterson, D.W. AU - Prost, L.R. AU - Saewert, G.W. AU - Saini, A. AU - Scarpine, V.E. AU - Shemyakin, A.V. AU - Singh, K. AU - Steimel, J. AU - Sukhanov, A.I. AU - Teotia, Vikas. AU - Varghese, P. AU - Wang, R. AU - Warner, A. AU - Wu, G. AU - Zifko, R.M. ED - McIntosh, Peter ED - Burt, Graeme ED - Apsimon, Robert ED - Schaa, Volker R.W. TI - Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility J2 - Proc. of LINAC2022, Liverpool, UK, 28 August-02 September 2022 CY - Liverpool, UK T2 - International Linear Accelerator Conference T3 - 31 LA - english AB - The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators. PB - JACoW Publishing CP - Geneva, Switzerland SP - 13 EP - 17 KW - cavity KW - MMI KW - cryomodule KW - operation KW - MEBT DA - 2022/09 PY - 2022 SN - 2226-0366 SN - 978-3-95450-215-8 DO - doi:10.18429/JACoW-LINAC2022-MO1PA01 UR - https://jacow.org/linac2022/papers/mo1pa01.pdf ER -