Author: Boffo, C.
Paper Title Page
MO1PA01 Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility 13
 
  • E. Pozdeyev, R. Andrews, C.M. Baffes, M. Ball, C. Boffo, R. Campos, J.-P. Carneiro, B.E. Chase, A.Z. Chen, D.J. Crawford, J. Czajkowski, N. Eddy, M. El Baz, M.G. Geelhoed, V.M. Grzelak, P.M. Hanlet, B.M. Hanna, B.J. Hansen, E.R. Harms, B.F. Harrison, M.A. Ibrahim, K.R. Kendziora, M.J. Kucera, D.D. Lambert, J.R. Leibfritz, P. Lyalyutskyy, J.N. Makara, H. Maniar, L. Merminga, R. Neswold, D.J. Nicklaus, J.P. Ozelis, D. Passarelli, N. Patel, D.W. Peterson, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, J. Steimel, A.I. Sukhanov, P. Varghese, R. Wang, A. Warner, G. Wu, R.M. Zifko
    Fermilab, Batavia, Illinois, USA
  • V.K. Mishra, M.M. Pande, K. Singh, Vikas. Teotia
    BARC, Mumbai, India
 
  The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides MO1PA01 [2.714 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MO1PA01  
About • Received ※ 16 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 28 August 2022 — Issue date ※ 13 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOGE12 Final Design of the Pre-Production SSR2 Cryomodule for PIP-II Project at Fermilab 511
 
  • J. Bernardini, C. Boffo, M. Chen, J. Helsper, M. Kramp, F.L. Lewis, T.H. Nicol, M. Parise, D. Passarelli, V. Roger, G.V. Romanov, B. Squires, M. Turenne
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by Fermi Research Alliance, LLC under Contract No. DEAC02- 07CH11359 with the United States Department of Energy, Office of Science, Office of High Energy Physics.
The present contribution reports the design of the pre-production Single Spoke Resonator Type 2 Cryomodule (ppSSR2 CM), developed in the framework of the PIP-II project at Fermilab. The innovative design is based on a structure, the strongback, which supports the coldmass from the bottom, stays at room temperature during operations, and can slide longitudinally with respect to the vacuum vessel. The Fermilab style cryomodule developed for the prototype Single Spoke Resonator Type 1 (pSSR1) and the prototype High Beta 650 MHz (pHB650) cryomodules is the baseline of the current design, which paves the way for production SSR1 and SSR2 cryomodules for the PIP-II linac. The focus of this contribution is on the results of calculations and finite element analysis performed to optimize the critical components of the cryomodule: vacuum vessel, strongback, thermal shield, and magnetic shield.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE12  
About • Received ※ 24 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 30 August 2022 — Issue date ※ 02 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)