Author: Chase, B.E.
Paper Title Page
MO1PA01 Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility 13
 
  • E. Pozdeyev, R. Andrews, C.M. Baffes, M. Ball, C. Boffo, R. Campos, J.-P. Carneiro, B.E. Chase, A.Z. Chen, D.J. Crawford, J. Czajkowski, N. Eddy, M. El Baz, M.G. Geelhoed, V.M. Grzelak, P.M. Hanlet, B.M. Hanna, B.J. Hansen, E.R. Harms, B.F. Harrison, M.A. Ibrahim, K.R. Kendziora, M.J. Kucera, D.D. Lambert, J.R. Leibfritz, P. Lyalyutskyy, J.N. Makara, H. Maniar, L. Merminga, R. Neswold, D.J. Nicklaus, J.P. Ozelis, D. Passarelli, N. Patel, D.W. Peterson, L.R. Prost, G.W. Saewert, A. Saini, V.E. Scarpine, A.V. Shemyakin, J. Steimel, A.I. Sukhanov, P. Varghese, R. Wang, A. Warner, G. Wu, R.M. Zifko
    Fermilab, Batavia, Illinois, USA
  • V.K. Mishra, M.M. Pande, K. Singh, Vikas. Teotia
    BARC, Mumbai, India
 
  The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides MO1PA01 [2.714 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MO1PA01  
About • Received ※ 16 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 28 August 2022 — Issue date ※ 13 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOJO12 LCLS-II-HE Cryomodule Testing at Fermilab 721
 
  • A.T. Cravatta, T.T. Arkan, D. Bafia, B.E. Chase, M. Checchin, C. Contreras-Martinez, B. Giaccone, B.J. Hansen, E.R. Harms, B.D. Hartsell, J.A. Kaluzny, D.D. Lambert, J.N. Makara, H. Maniar, M. Martinello, Y.M. Pischalnikov, S. Posen, J. Reid, N. Solyak, D. Sun, A. Syed, R. Wang, M.J. White, G. Wu
    Fermilab, Batavia, Illinois, USA
  • S. Aderhold, A.L. Benwell, J.D. Fuerst, D. Gonnella, T. Hiatt, S.L. Hoobler, J.T. Maniscalco, J. Nelson, L.M. Zacarias
    SLAC, Menlo Park, California, USA
  • L.R. Doolittle, S. Paiagua, C. Serrano
    LBNL, Berkeley, California, USA
 
  22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.  
poster icon Poster THPOJO12 [0.899 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-THPOJO12  
About • Received ※ 18 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 06 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)