MOPOPA13 200 MV Record Voltage of vCM and LCLS-II-HE Cryomodules Production Start Fermilab 95
 
  • T.T. Arkan, D. Bafia, D.J. Bice, J.N. Blowers, A.T. Cravatta, B. Giaccone, C.J. Grimm, B.D. Hartsell, J.A. Kaluzny, M. Martinello, T.H. Nicol, Y.M. Orlov, S. Posen
    Fermilab, Batavia, Illinois, USA
  • M. Checchin
    SLAC, Menlo Park, California, USA
 
  Funding: Department of Energy
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and 1 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and one BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.
 
poster icon Poster MOPOPA13 [1.975 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MOPOPA13  
About • Received ※ 10 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 09 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOJO12 LCLS-II-HE Cryomodule Testing at Fermilab 721
 
  • A.T. Cravatta, T.T. Arkan, D. Bafia, B.E. Chase, M. Checchin, C. Contreras-Martinez, B. Giaccone, B.J. Hansen, E.R. Harms, B.D. Hartsell, J.A. Kaluzny, D.D. Lambert, J.N. Makara, H. Maniar, M. Martinello, Y.M. Pischalnikov, S. Posen, J. Reid, N. Solyak, D. Sun, A. Syed, R. Wang, M.J. White, G. Wu
    Fermilab, Batavia, Illinois, USA
  • S. Aderhold, A.L. Benwell, J.D. Fuerst, D. Gonnella, T. Hiatt, S.L. Hoobler, J.T. Maniscalco, J. Nelson, L.M. Zacarias
    SLAC, Menlo Park, California, USA
  • L.R. Doolittle, S. Paiagua, C. Serrano
    LBNL, Berkeley, California, USA
 
  22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.  
poster icon Poster THPOJO12 [0.899 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-THPOJO12  
About • Received ※ 18 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 06 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)