First Years of Linac4 RF Operation |
25 |
|
- S. Ramberger, R. Wegner
CERN, Meyrin, Switzerland
|
|
|
Following the construction, commissioning, run-in, and connection, in 2021 Linac4 at CERN saw its successful start-up to full operation. Being composed primarily of RF systems, occupying most of the tunnel and the equipment hall, a coordinated effort has been put in place by 4 RF teams providing cavities, amplifier chains, low-level RF and general control systems. While all parts came together with impressive performance from day one, many details required a considerable debugging effort to achieve the requested availability of at least 95% from first operation in the synchrotron complex. This talk will focus on issues in equipment reliability, radiation to electronics, thermal stability, systems interaction, as well as a few aspects of complex low-level RF setup. It will also discuss decisions taken with respect to spare policies and upgrades for the coming years.
|
|
|
Slides MO1PA03 [3.992 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-MO1PA03
|
|
About • |
Received ※ 14 August 2022 — Revised ※ 25 August 2022 — Accepted ※ 02 September 2022 — Issue date ※ 11 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|