SPIRAL2 Final Commissioning Results |
314 |
|
- A.K. Orduz, P.-E. Bernaudin, M. Di Giacomo, R. Ferdinand, B. Jacquot, O. Kamalou, J.-M. Lagniel, G. Normand, A. Savalle
GANIL, Caen, France
- D.U. Uriot
CEA-DRF-IRFU, France
|
|
|
The commissioning of SPIRAL2 was carried out in different steps and slots from 2014 to end 2021. In a first phase, the proton-deuteron and heavy ion sources, LEBT lines and RFQ were commissioned and validated with A/Q=1 up to 3 particles. The validation of the MEBT (between the RFQ and the linac, including the Single Bunch Selector), linac and HEBT lines (up to the beam dump and to the NFS experimental room) started on July 2019, when GANIL received the authorization to operate SPIRAL2. The linac tuning is now validated with H+, 4He2+ and D+ and nominal H+ and D+ beams were sent to NFS for physics experiments. The main results obtained during the commissioning stages and the strategy used by the commissioning team are presented.
|
|
|
|
|
|
please see instructions how to view/control embeded videos |
|
|
Slides TU2AA02 [3.724 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TU2AA02
|
|
About • |
Received ※ 24 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 02 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
FR1AA04 |
SARAF Commissioning: Injector, MEBT and Chopper |
872 |
|
- J. Dumas, D. Chirpaz, D. Darde, J. Dumas, R.D. Duperrier, G. Ferrand, A. Gaget, F. Gohier, F. Gougnaud, T.J. Joannem, V. Nadot, N. Pichoff, F. Senée, C. Simon, D.U. Uriot, L. Zhao
CEA-IRFU, Gif-sur-Yvette, France
- A. Chancé
CEA, Gif-sur-Yvette, France
- S. Cohen, I.G. Gertz, N. Goldberger, H. Isakov, B. Kaizer, A. Kreisel, J. Luner, I. Mardor, H. Paami, A. Perry, I. Polikarpov, E. Reinfeld, J. Rodnitsky, I. Shmuely, A. Shor, Y. Solomon, N. Tamim, R. Weiss-Babai, L. Weissman, T. Zchut
Soreq NRC, Yavne, Israel
- G. Desmarchelier, N. Solenne
CEA-DRF-IRFU, France
|
|
|
IAEC/SNRC (Israel) is constructing an accelerator fa-cility, SARAF, for neutron production. It is based on a linac accelerating 5 mA CW deuteron and proton beam up to 40 MeV. As a first phase, IAEC constructed and operated a linac (SARAF Phase I), from which remains an ECR ion source, a Low-Energy Beam Transport (LEBT) line and a 4-rod RFQ. Since 2015, IAEC and CEA (France) are collaborating in the second phase, consisting in manufacturing of the linac (Figure 1). The injector control-system has been recently updated and the Medium Energy Beam Transport (MEBT) line has been installed and integrated to the infrastructure. It has been partially commissioned during the first semester of 2022. This paper presents the results of the integration, tests and commissioning of the injector and MEBT, be-fore delivery of the cryomodules.
|
|
|
|
|
|
please see instructions how to view/control embeded videos |
|
|
Slides FR1AA04 [2.971 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-FR1AA04
|
|
About • |
Received ※ 21 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 14 September 2022 — Issue date ※ 15 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|