Author: Serrano, C.
Paper Title Page
THPOJO12 LCLS-II-HE Cryomodule Testing at Fermilab 721
 
  • A.T. Cravatta, T.T. Arkan, D. Bafia, B.E. Chase, M. Checchin, C. Contreras-Martinez, B. Giaccone, B.J. Hansen, E.R. Harms, B.D. Hartsell, J.A. Kaluzny, D.D. Lambert, J.N. Makara, H. Maniar, M. Martinello, Y.M. Pischalnikov, S. Posen, J. Reid, N. Solyak, D. Sun, A. Syed, R. Wang, M.J. White, G. Wu
    Fermilab, Batavia, Illinois, USA
  • S. Aderhold, A.L. Benwell, J.D. Fuerst, D. Gonnella, T. Hiatt, S.L. Hoobler, J.T. Maniscalco, J. Nelson, L.M. Zacarias
    SLAC, Menlo Park, California, USA
  • L.R. Doolittle, S. Paiagua, C. Serrano
    LBNL, Berkeley, California, USA
 
  22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.  
poster icon Poster THPOJO12 [0.899 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-THPOJO12  
About • Received ※ 18 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 06 September 2022 — Issue date ※ 15 September 2022