TUPOGE12 Final Design of the Pre-Production SSR2 Cryomodule for PIP-II Project at Fermilab 511
 
  • J. Bernardini, C. Boffo, M. Chen, J. Helsper, M. Kramp, F.L. Lewis, T.H. Nicol, M. Parise, D. Passarelli, V. Roger, G.V. Romanov, B. Squires, M. Turenne
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by Fermi Research Alliance, LLC under Contract No. DEAC02- 07CH11359 with the United States Department of Energy, Office of Science, Office of High Energy Physics.
The present contribution reports the design of the pre-production Single Spoke Resonator Type 2 Cryomodule (ppSSR2 CM), developed in the framework of the PIP-II project at Fermilab. The innovative design is based on a structure, the strongback, which supports the coldmass from the bottom, stays at room temperature during operations, and can slide longitudinally with respect to the vacuum vessel. The Fermilab style cryomodule developed for the prototype Single Spoke Resonator Type 1 (pSSR1) and the prototype High Beta 650 MHz (pHB650) cryomodules is the baseline of the current design, which paves the way for production SSR1 and SSR2 cryomodules for the PIP-II linac. The focus of this contribution is on the results of calculations and finite element analysis performed to optimize the critical components of the cryomodule: vacuum vessel, strongback, thermal shield, and magnetic shield.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE12  
About • Received ※ 24 August 2022 — Revised ※ 26 August 2022 — Accepted ※ 30 August 2022 — Issue date ※ 02 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOGE16 Standardization and First Lessons Learned of the Prototype HB650 Cryomodule for PIP-II at Fermilab 526
 
  • V. Roger, J. Bernardini, S.K. Chandrasekaran, C.J. Grimm, O. Napoly, J.P. Ozelis, M. Parise, D. Passarelli
    Fermilab, Batavia, Illinois, USA
  • N. Bazin, R. Cubizolles
    CEA-IRFU, Gif-sur-Yvette, France
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
The prototype High Beta 650 MHz cryomodule (pHB650 CM) has been designed by an integrated design team, consisting of Fermilab (USA), CEA (France), STFC UKRI (UK), and RRCAT (India). The manufacturing and assembly of this prototype cryomodule is being done at Fermilab, whereas the production cryomodules will be manufactured and assembled by STFC-UKRI. As the first PIP-II cryomodule for which standardization was applied, the design, manufacturing and assembly of this cryomodule led to significant lessons being learnt and experiences gathered. These were incorporated into the design of the pre-production Single Spoke Resonator Type 2 cryomodule (ppSSR2 CM) and the pre-production Low Beta 650 MHz cryomodule (ppLB650 CM). This paper presents the pHB650 CM lessons learned and experiences gathered from the design to the lower coldmass assembly and how this cryomodule has a positive impact on all the next Proton Improvement Plan-II (PIP-II) cryomodules due to the standardization set up among SSR and 650 cryomodules.
 
poster icon Poster TUPOGE16 [1.478 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE16  
About • Received ※ 11 August 2022 — Revised ※ 17 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOGE17 Fabrication Experience of the Pre-Production PIP-II SSR2 Cavities at Fermilab 529
 
  • M. Parise, D. Passarelli, V. Roger
    Fermilab, Batavia, Illinois, USA
  • P. Duchesne, D. Longuevergne
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
The Proton Improvement Plan-II (PIP-II, [1]) linac will in- clude 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabri- cation process. Furthermore, development studies will be presented together with other design validation tests.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE17  
About • Received ※ 14 August 2022 — Revised ※ 16 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 04 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)