Author: Premo, K.S.
Paper Title Page
TUPOPA25 Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers 462
 
  • J. Helsper, S.K. Chandrasekaran, F. Furuta, B.M. Hanna, S. Kazakov, J.P. Ozelis, K.S. Premo, N. Solyak, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported, in part, by the U.S. Department of Energy, Office of Science, Office of High Energy Physics, under U.S. DOE Contract No. DE-AC02-07CH11359.
Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.
 
poster icon Poster TUPOPA25 [2.695 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOPA25  
About • Received ※ 24 August 2022 — Revised ※ 25 August 2022 — Accepted ※ 29 August 2022 — Issue date ※ 02 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)