Author: Paiagua, S.
Paper Title Page
THPOJO12 LCLS-II-HE Cryomodule Testing at Fermilab 721
 
  • A.T. Cravatta, T.T. Arkan, D. Bafia, B.E. Chase, M. Checchin, C. Contreras-Martinez, B. Giaccone, B.J. Hansen, E.R. Harms, B.D. Hartsell, J.A. Kaluzny, D.D. Lambert, J.N. Makara, H. Maniar, M. Martinello, Y.M. Pischalnikov, S. Posen, J. Reid, N. Solyak, D. Sun, A. Syed, R. Wang, M.J. White, G. Wu
    Fermilab, Batavia, Illinois, USA
  • S. Aderhold, A.L. Benwell, J.D. Fuerst, D. Gonnella, T. Hiatt, S.L. Hoobler, J.T. Maniscalco, J. Nelson, L.M. Zacarias
    SLAC, Menlo Park, California, USA
  • L.R. Doolittle, S. Paiagua, C. Serrano
    LBNL, Berkeley, California, USA
 
  22 Linac Co­her­ent Light Source II (LCLS-II) cry­omod­ules were suc­cess­fully tested at the Cry­omod­ule Test Fa­cil­ity (CMTF) at Fer­mi­lab. Fol­low­ing the com­ple­tion of the LCLS-II test­ing pro­gram, CMTF has shifted to test­ing cry­omod­ules for the LCLS-II High En­ergy up­grade (LCLS-II-HE). The first LCLS-II-HE cry­omod­ule, the ver­i­fi­ca­tion cry­omod­ule (vCM), was suc­cess­fully tested and ver­i­fied the readi­ness of LCLS-II-HE cry­omod­ule test­ing at CMTF, and pro­duc­tion cry­omod­ule test­ing has begun. Pre­sented here are the pro­duc­tion cry­omod­ule test ac­cep­tance cri­te­ria, test­ing plan, and cry­omod­ule test re­sults so far.  
poster icon Poster THPOJO12 [0.899 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-THPOJO12  
About • Received ※ 18 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 06 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)