MOPOPA19 | Preparation for Commissioning with Beam of "Advanced Demonstrator" Module with Heavy Ion Beam | 114 |
|
||
The integration of the accelerator components in to the cryogenic module prototype (Advanced Demonstrator) is a major milestone of the R&D for the superconducting heavy ion continuous wave linear accelerator HELIAC at GSI. The HELIAC is joint project of Helmholtz Institute Mainz (HIM) and GSI developed in collaboration with IAP Goethe University Frankfurt. This module is equipped with three superconducting (sc) Cross bar H-mode (CH) acceleration cavities CH0-CH2 and a sc rebuncher cavity, as well as two sc solenoids. The commissioning of the cryogenic module with Argon beam at GSI is scheduled for August 2023. In preparation for the beam test activities, the beamline, which connects the High Charge State Injector (HLI) with the testing area, has been installed. The beamline comprises a pair of phase probes for Time Of Flight (TOF) measurement of the incoming beam energy, quadrupole lenses and a 4-gap RF-buncher cavity. The beam diagnostics bench behind the cryo module is equipped with phase probe pairs, a slit-grid device, a bunch shape monitor (Feshenko monitor) for measurements of the longitudinal beam profile. The bench allows complete 6d characterization of the ion beam. | ||
Poster MOPOPA19 [3.074 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MOPOPA19 | |
About • | Received ※ 24 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 04 September 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPOGE21 | A Superconducting 217 MHz Single Spoke Cavity for the Helmholtz Linear Accelerator at GSI | 200 |
|
||
Funding: Work supported by GSI, HIM, BMBF Contr. No. 05P18UMRB2 A new superconducting (SC) continuous wave (CW) linac, providing high efficient heavy ion acceleration above the coulomb barrier, is going to be built at GSI to fulfill the upcoming demands in the research field of super heavy element (SHE) synthesis. The so called HELIAC (HElmholtz LInear ACcelerator) delivers ion beams in the energy range of 3.5 MeV/u and 7.3 MeV/u with a mass to charge ratio (A/z) of up to 6. Superconducting multi-gap crossbar-H-mode (CH) cavities with a resonance frequency of 217 MHz are used for beam acceleration. In addition, SC single spoke buncher cavities should ensure longitudinal beam matching to the corresponding CH sections. Therefore, the first 217 MHz single spoke cavity with beta 0.07 has been developed at HIM/GSI and built at an industrial partner. In this paper the design of the cavity and first RF measurements during manufacturing are presented. |
||
Poster MOPOGE21 [2.619 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MOPOGE21 | |
About • | Received ※ 18 August 2022 — Revised ※ 24 August 2022 — Accepted ※ 27 August 2022 — Issue date ※ 31 August 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPOPA18 | Test and Commissioning of the HELIAC Power Coupler | 454 |
|
||
The superconducting continuous wave (cw) heavy ion HElmholtz LInear ACcelerator (HELIAC) is intended to be built at GSI in Darmstadt. With its high average beam current and repetition rate, the HELIAC is designed to fulfill the requirements of the super heavy element (SHE) research user program and the material sciences community at GSI. The accelerating cavities are of the superconducting Crossbar H-mode (CH) type, developed by GUF. Within the Advanced Demonstrator project, the first cryomodule, consisting of four cavities is scheduled for commissioning with beam in 2023. The former RF power couplers introduced a high heat input into the cryostat. Therefore, the coupler is redesigned at HIM in order to not only reduce the heat input but to provide an overall improved power coupler for the HELIAC. It is designed for maximal power of 5 kW cw at the frequency of 216.816 MHz. A prototype has been tested and commissioned recently. This includes several RF-tests at room temperature and in cryogenic environments. The results of these tests will be presented in this paper. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOPA18 | |
About • | Received ※ 20 August 2022 — Revised ※ 21 August 2022 — Accepted ※ 30 August 2022 — Issue date ※ 01 September 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |