Author: Le Dréan, D.
Paper Title Page
TUPOJO22 Progress of PIP-II Activities at IJCLab 402
 
  • P. Duchesne, N. Gandolfo, D. Le Dréan, D. Longuevergne, R. Martret, T. Pépin-Donat, F. Rabehasy, S. Roset, L.M. Vogt
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • P. Berrutti, M. Parise, D. Passarelli
    Fermilab, Batavia, Illinois, USA
 
  Since 2018, IJCLab is involved in PIP-II project on the design and development of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. First pre-production components have been fabricated, surface processing and cavity qualification in vertical cryostat are on-going. IJCLab has upgraded its facilities by developing a new set-up to perform rotational BCP. The progress of all processing and testing activities for PIP-II project will be reported and, in particular, a dedicated study to qualify removal uniformity compared to static BCP will be presented.  
poster icon Poster TUPOJO22 [1.997 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO22  
About • Received ※ 23 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOJO23 Accelerated Lifetime Test of Spoke Cavity Cold Tuning Systems for Myrrha 406
 
  • N. Gandolfo, S. Blivet, F. Chatelet, V. Delpech, D. Le Dréan, G. Mavilla, M. Pierens, H. Saugnac
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
 
  Within the framework of MINERVA, the first Phase of MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) project, IN2P3 labs are in charge of the developments of several accelerator elements. Among those, a fully equipped Spoke cryomodule prototype was constructed, it integrates two superconducting single spoke cavities operating at 2K, the RF power couplers and the associated cold tuning systems. The extreme reliability specified for this project motivated to conduct ALT (Accelerated Lifetime Test) on two extra cold tuning systems in cryomodule like environment. Thus, by gathering information from experimental data, many aspects can be enhanced like maintenance plan consolidation, determination of aging indicators and design optimization of the whole system and its sub components. This paper describes the complete ALT process from the studying elements and the test environment design, to the experimental results and findings.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO23  
About • Received ※ 15 August 2022 — Revised ※ 17 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 02 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)