Status and Beam Commissioning of the RAON Superconducting Linac | |
|
||
Installation of the low energy superconducting linac was completed by 2021 and first cool-down will be started soon followed by the beam commissioning. Status of the cool-down and the preparation of the beam commissioning will be presented and first result of the injector beam commissioing of the RAON heavy ion accelerator will be summarized. | ||
|
||
please see instructions how to view/control embeded videos | ||
Slides TU2AA03 [9.494 MB] | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPOGE06 | Performance Test of Mass-Production of HWR Cryomodules for SCL32 | 491 |
|
||
Funding: This work was supported by the Rare Isotope Science Project of Institute for Basic Science funded by Ministry of Science and ICT and NRF of Korea (2013M7A1A1075764) Mass production of the HWR (half wave resonator) cryomodules for SCL32 of RAON had been conducted since 2018 and all cryomodules were installed in the SCL3 tunnel in 2021. Total number of the HWR cavities and the HWR cryomodules are 106 and 34, respectively. Cryomodule performance test was started in September 2020 and finished in October 2021, except for one bunching cryomodule that will be installed in front of the high energy linac. The detailed procedure and the results of performance test is reported in detail. |
||
Poster TUPOGE06 [1.211 MB] | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE06 | |
About • | Received ※ 14 August 2022 — Revised ※ 23 August 2022 — Accepted ※ 12 September 2022 — Issue date ※ 15 September 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |