TUPOPA25 | Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers | 462 |
|
||
Funding: Work supported, in part, by the U.S. Department of Energy, Office of Science, Office of High Energy Physics, under U.S. DOE Contract No. DE-AC02-07CH11359. Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage. |
||