Author: Kane, M.T.W.
Paper Title Page
TUPOGE15 Prototype HB650 Transportation Validation for the PIP-II Project 523
 
  • J.P. Holzbauer, S. Cheban, C.J. Grimm, J. Helsper, R. Thiede, A.D. Wixson
    Fermilab, Batavia, Illinois, USA
  • R. Cubizolles
    CEA-IRFU, Gif-sur-Yvette, France
  • M.T.W. Kane
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
 
  Funding: Work supported by the Fermi National Accelerator Laboratory, managed and operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy.
The PIP-II Project at Fermilab is centered around a superconducting 800 MeV proton linac to upgrade and modernize the Fermilab accelerator complex, allowing increased beam current to intensity frontier experiments such as LBNF-DUNE. PIP-II includes strong international collaborations, including the delivery of 12 cryomodules from European labs to FNAL (3 from STFC-UKRI in the UK and 9 from CEA in France). The transatlantic shipment of these completed modules is identified as a serious risk for the project. To mitigate this risk, a rigorous and systematic process has been developed to design and validate a transport system, including specification, procedures, logistics, and realistic testing. This paper will detail the engineering process used to manage this effort across the collaboration and the results of the first major validation testing of the integrated shipping system prior to use with a cryomodule.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE15  
About • Received ※ 13 August 2022 — Revised ※ 19 August 2022 — Accepted ※ 30 August 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOGE08 Design of a Transport System for the PIP-II HB650 Cryomodule 498
 
  • M.T.W. Kane
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
  • J.P. Holzbauer
    Fermilab, Batavia, Illinois, USA
  • T.J. Jones, E.S. Jordan
    STFC/DL, Daresbury, Warrington, Cheshire, United Kingdom
 
  The PIP-II Project at FNAL requires the assembly of 3 high-beta 650MHz cryomodules at STFC Daresbury (DL) in the UK. These modules must be safely transported from DL to FNAL in the USA. Previous experience with cryomodule transport was leveraged at both labs to design a transport system to protect the cryomodules during transit. Requirements for the system included mitigation of shocks, drops, and vibrations, and acting as a lifting fixture. It is comprised of a tessellated steel frame which encompasses the module with a wire rope isolator arrangement which the module mounts to. The frame was designed to withstand the weight of the 12.5 tonne cryomodule in various load cases. Details of shock and vibration profiles were obtained from MIL-STD-810H and were used to guide the sizing of the isolators. The frame and the isolation system were analysed via FEA using the shock and vibration profiles as an input. The transport system was found to be suitable for the given isolation, frame stiffness, and lifting code requirements. The frame has been fabricated and successfully load tested at FNAL. It will now be road tested with a dummy cryomodule before undergoing a trial run to DL.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE08  
About • Received ※ 24 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 02 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)