Author: Groening, L.
Paper Title Page
MOPOPA17 RF Commissioning of the First-of-Series Cavity Section of the Alvarez 2.0 at GSI 106
 
  • M. Heilmann, L. Groening, C. Herr, M. Hoerr, S. Mickat, B. Schlitt, G. Schreiber
    GSI, Darmstadt, Germany
 
  The existing post-stripper DTL of the GSI UNILAC will be replaced with the new Alvarez 2.0 DTL to serve as the injector chain for the Facility of Antiproton and Ion Research (FAIR). The 108.4 MHz Alvarez 2.0 DTL with a total length of 55 meters has an input energy of 1.36 MeV/u and the output energy is 11.32 MeV/u. The presented First-of-Series (FoS) cavity section with 11 drift tubes and a total length of 1.9 m is the first part of the first cavity of the Alvarez 2.0 DTL. After copper plating and assembly of the cavity the RF-conditioning started in July 2021. These proceeding gives an overview on the results of the successfully RF-conditioning to reach the necessary gap voltage for uranium operation including a comfortable safety margin.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MOPOPA17  
About • Received ※ 24 August 2022 — Accepted ※ 29 August 2022 — Issue date ※ 01 September 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOGE19 Status of the New Intense Heavy Ion DTL Project Alvarez 2.0 at GSI 537
TUOPA04   use link to see paper's listing under its alternate paper code  
 
  • L. Groening, T. Dettinger, X. Du, M. Heilmann, M. Kaiser, E. Merz, S. Mickat, A. Rubin, C. Xiao
    GSI, Darmstadt, Germany
 
  The Alvarez-type post-stripper DTL at GSI accelerates intense ion beams with A/q <= 8.5 from 1.4 to 11.4 MeV/u. After more than 45 years of operation it suffers from aging and its design does not meet the requirements of the upcoming FAIR project. The design of a new 108 MHz Alvarez-type DTL has been completed and series components for the 55 m long DTL are under production. In preparation, a first cavity section as First of Series has been operated at nominal RF-parameters. Additionally, a prototype drift tube with internal pulsed quadrupole has been built and operated at nominal parameters successfully. High quality of copper-plating of large components and add-on parts has been achieved within the ambitious specifications. This contribution summarizes the current project status of Alvarez 2.0 at GSI and sketches the future path to completion.  
slides icon Slides TUPOGE19 [1.197 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE19  
About • Received ※ 18 August 2022 — Revised ※ 30 August 2022 — Accepted ※ 08 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)