TUPOJO22 Progress of PIP-II Activities at IJCLab 402
 
  • P. Duchesne, N. Gandolfo, D. Le Dréan, D. Longuevergne, R. Martret, T. Pépin-Donat, F. Rabehasy, S. Roset, L.M. Vogt
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • P. Berrutti, M. Parise, D. Passarelli
    Fermilab, Batavia, Illinois, USA
 
  Since 2018, IJCLab is involved in PIP-II project on the design and development of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. First pre-production components have been fabricated, surface processing and cavity qualification in vertical cryostat are on-going. IJCLab has upgraded its facilities by developing a new set-up to perform rotational BCP. The progress of all processing and testing activities for PIP-II project will be reported and, in particular, a dedicated study to qualify removal uniformity compared to static BCP will be presented.  
poster icon Poster TUPOJO22 [1.997 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO22  
About • Received ※ 23 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOPA16 Complete Study of the Multipactor Phenomenon for the MYRRHA 80 kW CW RF Couplers 448
 
  • Y. Gómez Martínez, P.-O. Dumont, M. Meyer
    LPSC, Grenoble Cedex, France
  • P. Duchesne, C. Joly, W. Kaabi
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
 
  MYRRHA [1] (Multi Purpose Hybrid Reactor for High Tech Applications) is an Accelerator Driven System (ADS) project. Its superconducting linac will provide a 600 MeV - 4 mA proton beam. The first project phase based on a 100 MeV linac is launched. The Radio-Frequency (RF) couplers have been designed to handle 80 kW CW (Continuous Wave) at 352.2 MHz. This paper describes the multipacting studies on couplers.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOPA16  
About • Received ※ 12 August 2022 — Revised ※ 22 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 05 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOGE17 Fabrication Experience of the Pre-Production PIP-II SSR2 Cavities at Fermilab 529
 
  • M. Parise, D. Passarelli, V. Roger
    Fermilab, Batavia, Illinois, USA
  • P. Duchesne, D. Longuevergne
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
The Proton Improvement Plan-II (PIP-II, [1]) linac will in- clude 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabri- cation process. Furthermore, development studies will be presented together with other design validation tests.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE17  
About • Received ※ 14 August 2022 — Revised ※ 16 August 2022 — Accepted ※ 31 August 2022 — Issue date ※ 04 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOJO21 Higher Order Modes Investigation in the PERLE Superconducting RF Cavity 731
SUPCGE01   use link to see paper's listing under its alternate paper code  
 
  • C. Barbagallo, P. Duchesne, W. Kaabi, G. Olry, Z.F. Zomer
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • R.A. Rimmer, H. Wang
    JLab, Newport News, Virginia, USA
 
  The regenerative Beam Break Up (BBU) excited by the dipole Higher Order Modes (HOMs) in superconducting RF (SRF) cavities is a crucial issue for continuous-wave high-current energy recovery linacs. Beam-induced monopole HOMs can increase the cryogenic losses of the linac also. One of the ways to limit these effects is to use HOM couplers on the beam tubes of cavities to absorb and untrap cavity eigenmodes. These couplers feature antennas designed to damp dangerous HOMs and adequately reject the fundamental mode. This study illustrates an investigation of the HOMs of a 5-cell 801.58 MHz elliptical SRF cavity designed for PERLE (Powerful Energy Recovery Linac for Experiments), a multi-turn energy recovery linac (ERL) currently under study and later to be hosted at IJCLab in Orsay. Time-domain wakefield and frequency-domain eigenmode simulations have been used to calculate the cavity broadband HOM impedance spectra and identify the dangerous BBU HOMs. The transmission characteristics of several coaxial HOM couplers have been studied. The efficiencies of several HOM-damping schemes have been compared to propose a HOM endgroup to be fabricated and added to the existing bare SRF cavity.  
poster icon Poster THPOJO21 [2.090 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-THPOJO21  
About • Received ※ 24 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 23 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)