TUPOJO05 |
Welding and Copper Plating Investigations on the FAIR Proton Linac |
345 |
|
- A. Seibel, T. Dettinger, C.M. Kleffner, K. Knie, C. Will
GSI, Darmstadt, Germany
- M.S. Breidt, H. Hähnel, U. Ratzinger
IAP, Frankfurt am Main, Germany
- J. Egly
PINK GmbH Vakuumtechnik, Wertheim, Germany
|
|
|
A FAIR injector linac for the future FAIR facility is under construction. In order to meet the requirements for copper plating of the CH-cavities, a variety of tests with dummy cavities has been per-formed and compared to simulation. Further dummy cavities have been produced in order to improve the welding techniques. In addition, the results on 3d-printed stems with drift tubes will be presented.
|
|
|
Poster TUPOJO05 [2.863 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO05
|
|
About • |
Received ※ 08 August 2022 — Revised ※ 14 August 2022 — Accepted ※ 24 August 2022 — Issue date ※ 15 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOGE19 |
Status of the New Intense Heavy Ion DTL Project Alvarez 2.0 at GSI |
537 |
TUOPA04 |
|
|
- L. Groening, T. Dettinger, X. Du, M. Heilmann, M. Kaiser, E. Merz, S. Mickat, A. Rubin, C. Xiao
GSI, Darmstadt, Germany
|
|
|
The Alvarez-type post-stripper DTL at GSI accelerates intense ion beams with A/q <= 8.5 from 1.4 to 11.4 MeV/u. After more than 45 years of operation it suffers from aging and its design does not meet the requirements of the upcoming FAIR project. The design of a new 108 MHz Alvarez-type DTL has been completed and series components for the 55 m long DTL are under production. In preparation, a first cavity section as First of Series has been operated at nominal RF-parameters. Additionally, a prototype drift tube with internal pulsed quadrupole has been built and operated at nominal parameters successfully. High quality of copper-plating of large components and add-on parts has been achieved within the ambitious specifications. This contribution summarizes the current project status of Alvarez 2.0 at GSI and sketches the future path to completion.
|
|
|
Slides TUPOGE19 [1.197 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE19
|
|
About • |
Received ※ 18 August 2022 — Revised ※ 30 August 2022 — Accepted ※ 08 September 2022 — Issue date ※ 15 September 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|