Author: Cleva, S.
Paper Title Page
TUPOJO13 Wire Scanner Systems at the European Spallation Source (ESS): Tests and First Beam Commissioning Results 372
 
  • C.S. Derrez, I. Bustinduy, E.M. Donegani, V. Grishin, H. Kocevar, J.P.S. Martins, N. Milas, R. Miyamoto, T.J. Shea, R. Tarkeshian, C.A. Thomas, P.L. van Velze
    ESS, Lund, Sweden
  • S. Cleva, R. De Monte, M. Ferianis, S. Grulja
    Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
  • I. Mazkiaran, A.R. Páramo
    ESS Bilbao, Derio, Spain
 
  The ESS beam instrumentation includes 3 different type of Wire Scanners (WS). Double wires systems are deployed in the MEBT part of NCL, and single wires and flying wire instruments are being tested and installed in the higher energy sections of the ESS linac. First beam tests result from the MEBT systems will be presented. The superconducting linac WS systems are based on scintillator detectors and wavelength shifting fibers are mounted on the beam pipe. The detectors are coupled to long haul optical fibers, which carry the signals to custom front end electronics sitting in controls racks at the surface. The acquisition chain have been characterized at IHEP (Protvino, Russia), ELETTRA (Trieste, Italy), CERN PSB, CoSy (IKP, Germany) and SNS (USA) before installation in the ESS tunnel. The test results of this system design, differing from the standard approach where photomultipliers are coupled to the scintillator will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO13  
About • Received ※ 24 August 2022 — Revised ※ 29 August 2022 — Accepted ※ 30 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)