Author: Breidt, M.S.
Paper Title Page
TUPOJO05 Welding and Copper Plating Investigations on the FAIR Proton Linac 345
 
  • A. Seibel, T. Dettinger, C.M. Kleffner, K. Knie, C. Will
    GSI, Darmstadt, Germany
  • M.S. Breidt, H. Hähnel, U. Ratzinger
    IAP, Frankfurt am Main, Germany
  • J. Egly
    PINK GmbH Vakuumtechnik, Wertheim, Germany
 
  A FAIR injector linac for the future FAIR facility is under construction. In order to meet the requirements for copper plating of the CH-cavities, a variety of tests with dummy cavities has been per-formed and compared to simulation. Further dummy cavities have been produced in order to improve the welding techniques. In addition, the results on 3d-printed stems with drift tubes will be presented.  
poster icon Poster TUPOJO05 [2.863 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO05  
About • Received ※ 08 August 2022 — Revised ※ 14 August 2022 — Accepted ※ 24 August 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOJO08 Upgrade and Commissioning of the 60 keV Low Energy Beam Transport Line for the Frankfurt Neutron Source FRANZ 352
 
  • H. Hähnel, A. Ateş, G. Blank, M.S. Breidt, D. Bänsch, R. Gössling, T. Metz, H. Podlech, U. Ratzinger, A. Rüffer, K. Volk, C. Wagner
    IAP, Frankfurt am Main, Germany
  • R.H. Hollinger, C. Zhang
    GSI, Darmstadt, Germany
  • H. Podlech
    HFHF, Frankfurt am Main, Germany
 
  The Low Energy Beam Transport line (LEBT) for the Frankfurt Neutron Source (FRANZ) has been redesigned to accommodate a 60 keV proton beam. Driven by a CHORDIS ion source, operating at 35 kV, a newly designed electrostatic postaccelerator has beeen installed to reach the desired beam energy of 60 keV. Additional upgrades to the beamline include two steerer pairs, several optical diagnostics sections and an additional faraday cup. We present the results of beam commissioning up to the point of RFQ injection. Emittance measurements were performed to prepare matching to the RFQ and improve the beam dynamics model of the low energy beamline. Due to the successful operation of the beamline at 60 keV, retrofitting of the RFQ for the new energy has been initiated.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO08  
About • Received ※ 22 August 2022 — Revised ※ 28 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 05 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)