Author: Blank, G.
Paper Title Page
MOPORI01 A Multi-Camera System for Tomographic Beam Diagnostics 215
 
  • A. Ateş, G. Blank, H. Hähnel, U. Ratzinger
    IAP, Frankfurt am Main, Germany
 
  A prototype of a beam-induced residual gas fluorescence monitor (BIF) has been developed and successfully tested at the Institute of Applied Physics (IAP) of the Goethe University Frankfurt. This BIF is based on ten single-board cameras inserted into the vacuum and directed onto the beam axis. The overall goal is to study the beam with tomography algorithms at a low energy beam transport section. Recently, we tested the detector with a 60keV, 15mA proton beam at 20Hz and 1ms puls length. In this paper we present the ongoing investigations on image processing and application of the algebraic reconstruction technique (ART).  
poster icon Poster MOPORI01 [1.826 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-MOPORI01  
About • Received ※ 20 August 2022 — Revised ※ 21 August 2022 — Accepted ※ 28 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOJO08 Upgrade and Commissioning of the 60 keV Low Energy Beam Transport Line for the Frankfurt Neutron Source FRANZ 352
 
  • H. Hähnel, A. Ateş, G. Blank, M.S. Breidt, D. Bänsch, R. Gössling, T. Metz, H. Podlech, U. Ratzinger, A. Rüffer, K. Volk, C. Wagner
    IAP, Frankfurt am Main, Germany
  • R.H. Hollinger, C. Zhang
    GSI, Darmstadt, Germany
  • H. Podlech
    HFHF, Frankfurt am Main, Germany
 
  The Low Energy Beam Transport line (LEBT) for the Frankfurt Neutron Source (FRANZ) has been redesigned to accommodate a 60 keV proton beam. Driven by a CHORDIS ion source, operating at 35 kV, a newly designed electrostatic postaccelerator has beeen installed to reach the desired beam energy of 60 keV. Additional upgrades to the beamline include two steerer pairs, several optical diagnostics sections and an additional faraday cup. We present the results of beam commissioning up to the point of RFQ injection. Emittance measurements were performed to prepare matching to the RFQ and improve the beam dynamics model of the low energy beamline. Due to the successful operation of the beamline at 60 keV, retrofitting of the RFQ for the new energy has been initiated.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOJO08  
About • Received ※ 22 August 2022 — Revised ※ 28 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 05 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)