Author: Ang, Z.T.
Paper Title Page
FR1AA03 Status and Challenges at TRIUMF ISAC Facility 866
 
  • Z.Y. Yao, Z.T. Ang, T. Au, K. Fong, X.L. Fu, J.J. Keir, P. Kolb, D. Lang, R.E. Laxdal, R. Leewe, Y. Ma, B. Matheson, R.S. Sekhon, B.S. Waraich, Q. Zheng, V. Zvyagintsev
    TRIUMF, Vancouver, Canada
 
  The ISAC facility uses the ISOL technique to produce radioactive ions for experiments. The post-accelerator consists of a room temperature linac (ISAC-I) and a su-perconducting linac (ISAC-II). After more than two dec-ades of beam delivery in ISAC, the RF systems have met various challenges regarding increased operation require-ments, system stability issues and performance improve-ments. This paper discusses the detailed challenges in recent years in both ISAC-I and ISAC-II. The upgrade plan or mitigation solution to address each challenge is reported respectively. A hint of the long-term vision at ISAC is also briefly described at the end of the paper.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides FR1AA03 [6.986 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-FR1AA03  
About • Received ※ 13 August 2022 — Revised ※ 21 August 2022 — Accepted ※ 29 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)