JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for TUPOJO18: Cavity Qualification and Production Update for SNS-PPU Cryomodules at Jefferson Lab

@inproceedings{dhakal:linac2022-tupojo18,
  author       = {P. Dhakal and E. Daly and J.F. Fischer and M.P. Howell and N.A. Huque and J.D. Mammosser},
  title        = {{Cavity Qualification and Production Update for SNS-PPU Cryomodules at Jefferson Lab}},
  booktitle    = {Proc. LINAC'22},
% booktitle    = {Proc. 31st International Linear Accelerator Conference (LINAC'22)},
  pages        = {387--389},
  eid          = {TUPOJO18},
  language     = {english},
  keywords     = {cavity, cryomodule, proton, SRF, neutron},
  venue        = {Liverpool, UK},
  series       = {International Linear Accelerator Conference},
  number       = {31},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {09},
  year         = {2022},
  issn         = {2226-0366},
  isbn         = {978-3-95450-215-8},
  doi          = {10.18429/JACoW-LINAC2022-TUPOJO18},
  url          = {https://jacow.org/linac2022/papers/tupojo18.pdf},
  abstract     = {{The Proton Power Upgrade (PPU) project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) currently being constructed will double the proton beam power capability from 1.4 to 2.8 MW by adding seven cryomodules, each containing four six-cell high-beta (β = 0.81) superconducting radio frequency cavities. Research Instruments, located in Germany, built and processed the cavities at the vendor site, including electropolishing as the final active chemistry step. Twenty-eight cavities for seven cryomodules and an additional four cavities for a spare cryomodules were delivered to Jefferson Lab and first qualification tests were completed on all cavities as received from the vendor. The performance largely exceeded the requirements on quality factor and accelerating gradient. Here we present the status of initial cavity qualification tests, rework on unqualified cavities and final cavity qualification with helium vessel prior to installation in cryomodules. In addition, an update on cryomodule production is presented.}},
}