JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.
TY - CONF AU - Podadera, I. AU - Aguilar, J. AU - Arranz, F. AU - Becerril-Jarque, S. AU - Bellan, L. AU - Bernardi, D. AU - Bolzon, B. AU - Cara, P. AU - Castellanos, J. AU - Chauvin, N. AU - Chel, S. AU - Duglue, G. AU - Dézsi, T. AU - Ferreira, M.J. AU - García, M. AU - Hauer, V. AU - Ibarra, A. AU - Jimenez-Rey, D. AU - Królas, W. AU - Lehmann, T. AU - Luque, M. AU - Macià, L. AU - Madur, A. AU - Maestre, J. AU - Martins, C.A. AU - Micciché, G. AU - Mollá, J. AU - Nitti, F.S. AU - Oliver, C. AU - Palmieri, A. AU - Pisent, A. AU - Prieto, C. AU - Qiu, Y.F. AU - Regidor, D. AU - Sanmartí, M. AU - Singh, B.K. AU - Sánchez-Herranz, D. AU - Torregrosa, C. AU - Weber, M. AU - Wiacek, U. AU - de la Morena, C. ED - McIntosh, Peter ED - Burt, Graeme ED - Apsimon, Robert ED - Schaa, Volker R.W. TI - Commissioning Plan of the IFMIF-DONES Accelerator J2 - Proc. of LINAC2022, Liverpool, UK, 28 August-02 September 2022 CY - Liverpool, UK T2 - International Linear Accelerator Conference T3 - 31 LA - english AB - IFMIF-DONES (International Fusion Materials Irradiation Facility- DEMO-Oriented Neutron Early Source) - a powerful neutron irradiation facility for studies and certification of materials to be used in fusion reactors - is planned as part of the European roadmap to fusion electricity. Its main goal will be to characterize and to qualify materials under irradiation in a neutron field similar to the one faced in a fusion reactor. The intense neutron source is produced by impinging deuterons, from high-power linear deuteron accelerator, on a liquid lithium curtain. The facility has accomplished the preliminary design phase and is currently in its detailed design phase. At the present stage, it is important to have a clear understanding of how the commissioning of the facility will be performed, especially the commissioning of a 5 MW CW deuteron beam, together with the lithium curtain and the beam optimization for the neutron irradiation. In this contribution, the present plans for the hardware and beam commissioning of the accelerator will be given, focusing on the most critical aspects of the tiered approach and on the integration of the procedure with the lithium and tests systems. PB - JACoW Publishing CP - Geneva, Switzerland SP - 330 EP - 333 KW - MMI KW - linac KW - neutron KW - rfq KW - target DA - 2022/09 PY - 2022 SN - 2226-0366 SN - 978-3-95450-215-8 DO - doi:10.18429/JACoW-LINAC2022-TUPOJO01 UR - https://jacow.org/linac2022/papers/tupojo01.pdf ER -