JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


RIS citation export for TUPOJO01: Commissioning Plan of the IFMIF-DONES Accelerator

TY  - CONF
AU  - Podadera, I.
AU  - Aguilar, J.
AU  - Arranz, F.
AU  - Becerril-Jarque, S.
AU  - Bellan, L.
AU  - Bernardi, D.
AU  - Bolzon, B.
AU  - Cara, P.
AU  - Castellanos, J.
AU  - Chauvin, N.
AU  - Chel, S.
AU  - Duglue, G.
AU  - Dézsi, T.
AU  - Ferreira, M.J.
AU  - García, M.
AU  - Hauer, V.
AU  - Ibarra, A.
AU  - Jimenez-Rey, D.
AU  - Królas, W.
AU  - Lehmann, T.
AU  - Luque, M.
AU  - Macià, L.
AU  - Madur, A.
AU  - Maestre, J.
AU  - Martins, C.A.
AU  - Micciché, G.
AU  - Mollá, J.
AU  - Nitti, F.S.
AU  - Oliver, C.
AU  - Palmieri, A.
AU  - Pisent, A.
AU  - Prieto, C.
AU  - Qiu, Y.F.
AU  - Regidor, D.
AU  - Sanmartí, M.
AU  - Singh, B.K.
AU  - Sánchez-Herranz, D.
AU  - Torregrosa, C.
AU  - Weber, M.
AU  - Wiacek, U.
AU  - de la Morena, C.
ED  - McIntosh, Peter
ED  - Burt, Graeme
ED  - Apsimon, Robert
ED  - Schaa, Volker R.W.
TI  - Commissioning Plan of the IFMIF-DONES Accelerator
J2  - Proc. of LINAC2022, Liverpool, UK, 28 August-02 September 2022
CY  - Liverpool, UK
T2  - International Linear Accelerator Conference
T3  - 31
LA  - english
AB  - IFMIF-DONES (International Fusion Materials Irradiation Facility- DEMO-Oriented Neutron Early Source) - a powerful neutron irradiation facility for studies and certification of materials to be used in fusion reactors - is planned as part of the European roadmap to fusion electricity. Its main goal will be to characterize and to qualify materials under irradiation in a neutron field similar to the one faced in a fusion reactor. The intense neutron source is produced by impinging deuterons, from high-power linear deuteron accelerator, on a liquid lithium curtain. The facility has accomplished the preliminary design phase and is currently in its detailed design phase. At the present stage, it is important to have a clear understanding of how the commissioning of the facility will be performed, especially the commissioning of a 5 MW CW deuteron beam, together with the lithium curtain and the beam optimization for the neutron irradiation. In this contribution, the present plans for the hardware and beam commissioning of the accelerator will be given, focusing on the most critical aspects of the tiered approach and on the integration of the procedure with the lithium and tests systems.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 330
EP  - 333
KW  - MMI
KW  - linac
KW  - neutron
KW  - rfq
KW  - target
DA  - 2022/09
PY  - 2022
SN  - 2226-0366
SN  - 978-3-95450-215-8
DO  - doi:10.18429/JACoW-LINAC2022-TUPOJO01
UR  - https://jacow.org/linac2022/papers/tupojo01.pdf
ER  -