        Status of the New Intense Heavy Ion DTL Project Alvarez 2.0 at GSI | 
        537 | 
    
    
        | TUOPA04 | 
        
          | 
    
    
        |   | 
        
                - L. Groening, T. Dettinger, X. Du, M. Heilmann, M. Kaiser, E. Merz, S. Mickat, A. Rubin, C. Xiao
 
                       GSI, Darmstadt, Germany 
          | 
          | 
    
    
        |   | 
        
        The Alvarez-type post-stripper DTL at GSI accelerates intense ion beams with A/q <= 8.5 from 1.4 to 11.4 MeV/u. After more than 45 years of operation it suffers from aging and its design does not meet the requirements of the upcoming FAIR project. The design of a new 108 MHz Alvarez-type DTL has been completed and series components for the 55 m long DTL are under production. In preparation, a first cavity section as First of Series has been operated at nominal RF-parameters. Additionally, a prototype drift tube with internal pulsed quadrupole has been built and operated at nominal parameters successfully. High quality of copper-plating of large components and add-on parts has been achieved within the ambitious specifications. This contribution summarizes the current project status of Alvarez 2.0 at GSI and sketches the future path to completion.
         | 
          | 
    
    
        
            
         | 
        
           Slides TUPOGE19 [1.197 MB]
         | 
          | 
    
    
    	  | DOI • | 
        reference for this paper 
              ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE19
         | 
          | 
    
    
    	  | About • | 
        Received ※ 18 August 2022 — Revised ※ 30 August 2022 — Accepted ※ 08 September 2022 — Issue date ※ 15 September 2022 | 
    
    
    	  | Cite • | 
        reference for this paper using 
              ※ BibTeX, 
              ※ LaTeX, 
              ※ Text/Word, 
              ※ RIS, 
              ※ EndNote (xml)
         | 
          | 
    
    
        |   |