Author: Lee, M.
Paper Title Page
TUPOGE06 Performance Test of Mass-Production of HWR Cryomodules for SCL32 491
 
  • Y. Kim, J.W. Choi, D.H. Gil, H. Jang, Y.W. Jo, J. Joo, H.C. Jung, H. Kim, M.S. Kim, M. Kwon, M. Lee, J.H. Shin
    IBS, Daejeon, Republic of Korea
  • Y.U. Sohn
    PAL, Pohang, Republic of Korea
 
  Funding: This work was supported by the Rare Isotope Science Project of Institute for Basic Science funded by Ministry of Science and ICT and NRF of Korea (2013M7A1A1075764)
Mass production of the HWR (half wave resonator) cryomodules for SCL32 of RAON had been conducted since 2018 and all cryomodules were installed in the SCL3 tunnel in 2021. Total number of the HWR cavities and the HWR cryomodules are 106 and 34, respectively. Cryomodule performance test was started in September 2020 and finished in October 2021, except for one bunching cryomodule that will be installed in front of the high energy linac. The detailed procedure and the results of performance test is reported in detail.
 
poster icon Poster TUPOGE06 [1.211 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE06  
About • Received ※ 14 August 2022 — Revised ※ 23 August 2022 — Accepted ※ 12 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)