Author: Kolb, P.
Paper Title Page
TUPOGE01 Commissioning of the VECC Cryomodule 476
 
  • Z.Y. Yao, R. Bjarnason, J. Cheung, K. Fong, J.J. Keir, D. Kishi, S. Kiy, P. Kolb, D. Lang, R.E. Laxdal, B. Matheson, R.S. Sekhon, B.S. Waraich, Q. Zheng, V. Zvyagintsev
    TRIUMF, Vancouver, Canada
 
  A quarter-wave resonator (QWR) cryomodule was designed and assembled at TRIUMF for the energy upgrade of the VECC ISOL-RIB facility to boost radioactive isotopes from 1MeV/u to 2MeV/u. The top loading cryomodule was chosen based on the ISAC-II low energy section design, consisting of four superconducting QWRs and one superconducting solenoid. The major change from ISAC-II concept is separating the RF space vacuum from the isolation vacuum. The cryogenic commissioning was recently completed. The cold mass alignments and the cryogenic heat loads were measured. The cavity performance was qualified in both test regime and operating regime. The cavity degradations caused by magnetic pollution from solenoid and the recovery procedure were verified. This paper will report the detailed results of the commissioning.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-TUPOGE01  
About • Received ※ 23 August 2022 — Revised ※ 28 August 2022 — Accepted ※ 01 September 2022 — Issue date ※ 03 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FR1AA03 Status and Challenges at TRIUMF ISAC Facility 866
 
  • Z.Y. Yao, Z.T. Ang, T. Au, K. Fong, X.L. Fu, J.J. Keir, P. Kolb, D. Lang, R.E. Laxdal, R. Leewe, Y. Ma, B. Matheson, R.S. Sekhon, B.S. Waraich, Q. Zheng, V. Zvyagintsev
    TRIUMF, Vancouver, Canada
 
  The ISAC facility uses the ISOL technique to produce radioactive ions for experiments. The post-accelerator consists of a room temperature linac (ISAC-I) and a su-perconducting linac (ISAC-II). After more than two dec-ades of beam delivery in ISAC, the RF systems have met various challenges regarding increased operation require-ments, system stability issues and performance improve-ments. This paper discusses the detailed challenges in recent years in both ISAC-I and ISAC-II. The upgrade plan or mitigation solution to address each challenge is reported respectively. A hint of the long-term vision at ISAC is also briefly described at the end of the paper.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides FR1AA03 [6.986 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-FR1AA03  
About • Received ※ 13 August 2022 — Revised ※ 21 August 2022 — Accepted ※ 29 August 2022 — Issue date ※ 01 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)