Author: Chirpaz, D.
Paper Title Page
FR1AA04 SARAF Commissioning: Injector, MEBT and Chopper 872
 
  • J. Dumas, D. Chirpaz, D. Darde, J. Dumas, R.D. Duperrier, G. Ferrand, A. Gaget, F. Gohier, F. Gougnaud, T.J. Joannem, V. Nadot, N. Pichoff, F. Senée, C. Simon, D.U. Uriot, L. Zhao
    CEA-IRFU, Gif-sur-Yvette, France
  • A. Chancé
    CEA, Gif-sur-Yvette, France
  • S. Cohen, I.G. Gertz, N. Goldberger, H. Isakov, B. Kaizer, A. Kreisel, J. Luner, I. Mardor, H. Paami, A. Perry, I. Polikarpov, E. Reinfeld, J. Rodnitsky, I. Shmuely, A. Shor, Y. Solomon, N. Tamim, R. Weiss-Babai, L. Weissman, T. Zchut
    Soreq NRC, Yavne, Israel
  • G. Desmarchelier, N. Solenne
    CEA-DRF-IRFU, France
 
  IAEC/SNRC (Israel) is constructing an accelerator fa-cility, SARAF, for neutron production. It is based on a linac accelerating 5 mA CW deuteron and proton beam up to 40 MeV. As a first phase, IAEC constructed and operated a linac (SARAF Phase I), from which remains an ECR ion source, a Low-Energy Beam Transport (LEBT) line and a 4-rod RFQ. Since 2015, IAEC and CEA (France) are collaborating in the second phase, consisting in manufacturing of the linac (Figure 1). The injector control-system has been recently updated and the Medium Energy Beam Transport (MEBT) line has been installed and integrated to the infrastructure. It has been partially commissioned during the first semester of 2022. This paper presents the results of the integration, tests and commissioning of the injector and MEBT, be-fore delivery of the cryomodules.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides FR1AA04 [2.971 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-LINAC2022-FR1AA04  
About • Received ※ 21 August 2022 — Revised ※ 27 August 2022 — Accepted ※ 14 September 2022 — Issue date ※ 15 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)